By 9:00am they had the old windows and door of the back porch gone. |
Work done:
Demolition of the old back porch and bay window removed. Framing of the new back entryway started.
9:00am |
2:00pm - entryway floor is roughed in. |
4:30pm |
4:30pm. New back entryway is framed. (Note: old back windows on the left) |
View at the end of the day. |