Things didn't go as planned over this weekend. A roofing crew was supposed to get the shingles done on Saturday. It was a little rainy around 8am in the morning, though, so the shingles work was cancelled.
Sunday a downpour came through and suddenly we had water leaking into our kitchen where the OSB board was nailed to the counter around the kitchen sink. The JCJ crew had put some plastic up on the roof, but not with the expectation that it would need to withstand torrential rains.
The roof was left something like this at the end of the day Friday. |
On Sunday, May 23, in the downpour, John got more tarp covering over the entryway.